Module.jpg

Modular construction

Modular construction and waterborne transport

In addition to the stick-build construction in the 5 new tank pits and a train loading station, a large portion of the steel structures was pre-assembled into 6 modules at a quayside location, including piping. Using floating sheerlegs, the modules were then transported by water to their final location.

Relevant projects

071dd19112021Rijndijk-Koole-©Kloet.jpg

Replacement of Jetty 7 – Koole Tankstorage Botlek

Supply and installation of the topside structure for the replacement of Jetty 7.

20241203_135657.jpg

Olympia Project DOW Terneuzen

Supply and installation of steel structures, hot-dip galvanized and partially treated with 120-minute fire-resistant coating.

project-detail-video.webp

MSCN XA-1 Project

Supply and installation of steel structures, hot-dip galvanized and partially treated with 120-minute fire-resistant coating.