Supply and installation of hot-dip galvanized steel structures on and around a 197,000 m3 ethane tank for INEOS Project ONE.
TGE Gas Engineering
Antwerpen BE
500 ton
2025
Supply and installation of the topside structure for the replacement of Jetty 7.
Supply and installation of steel structures, hot-dip galvanized and partially treated with 120-minute fire-resistant coating.