Headquarters Sabic

Engineering, production and assembly of a 230-ton steel construction.

 

The building has an elliptical roof, which means that not one of the 1,850 steel beams is identical. We were involved early on in the thinking process with BAM with regard to how to erect this building. The steel components were pre-assembled, onsite, on the floor. As a result, all the ‘pieces of the puzzle' eventually fit together and created a strong support structure for 1,300 m² of plates and a 385 m² glass construction for the roof.

  • ClientBam Utiliteitsbouw
  • Order value€ 960.000,00
  • Weight230 tonnes of steel