EPE Train III
Engineering, delivery and assembly of 2,500 tonnes of steel: 6,200 sq.m. of gratings / 840 stair treads, 4,400 sq.m. of Ytong prefab concrete elements, roofing, roof sheeting and installation of steel doors.
- ClientDOW Chemical, Terneuzen
- Order value€ 6.450.000,00
- Weight2,500 tonnes of steel