EPE Train III

Engineering, delivery and assembly of 2,500 tonnes of steel: 6,200 sq.m. of gratings / 840 stair treads, 4,400 sq.m. of Ytong prefab concrete elements, roofing, roof sheeting and installation of steel doors.

  • ClientDOW Chemical, Terneuzen
  • Order value€ 6.450.000,00
  • Weight2,500 tonnes of steel

Back to overview

EPE Train III